Session
No Flag Day: Migrating a Production Lakehouse at Robinhood Without Stopping the Pipelines
Most migration stories move one database. This one moves an entire analytical platform. At Robinhood, the Data Platform team moved a large fleet of production data pipelines onto a new lakehouse while those pipelines kept landing data and downstream teams kept their freshness SLAs. There was no delivery freeze and no flag day.
At this scale, copying data is the easy part. The hard part is proving, pipeline by pipeline, that the new path is correct before anyone depends on it, and being able to undo the move instantly if it is not. This talk walks through the migration state machine we used:
- Readiness: each pipeline runs cleanly on the new stack before any dual write.
- Parallel run: the new pipeline writes to a staging location under real production load while the old one keeps serving.
- Reconciliation: row counts and key aggregates must match within set thresholds, and freshness must hold, for long enough to trust.
- Cost guardrails: each pipeline is compared against the old path so the migration does not quietly get more expensive.
- Catalog swap: consumers resolve tables through the catalog, so cutover is a metadata change, not a data rewrite, and every reader flips at once.
- Rollback: allowed only from the swap, by pointing the catalog back, which keeps it simple and tested.
You will leave with a reusable migration state machine, clear rules for when to roll back, and the reconciliation signals that kept a dual path honest at scale.
Chetas Joshi
Software engineer with 10+ years of experience in the Data & AI
Foster City, California, United States
Links
Please note that Sessionize is not responsible for the accuracy or validity of the data provided by speakers. If you suspect this profile to be fake or spam, please let us know.
Jump to top