Session

Planning, Design, and Construction of the Ashland WTP: A 10 Year Journey

This presentation is about the long-running effort to replace a failing water plant with a new greenfield facility designed to address for turbidity, wildfires, and algal toxins.

Pierre Kwan

HDR Water Treatment Technical Director

Actions

Please note that Sessionize is not responsible for the accuracy or validity of the data provided by speakers. If you suspect this profile to be fake or spam, please let us know.